MMEC and CCG Awarded Contract for Water Supply Systems Supervision in Kyrgyzstan Project to Benefit Batken and Talas Regions with Improved Water Infrastructure Makki Engineering Consultancy (MMEC), in collaboration with Consolidated Consultants for Engineering and Environment (CCG), has been awarded a significant contract to supervise the construction of water supply systems in the Batken and Talas regions of the Kyrgyz Republic. The project, valued at $1,747,400, is funded by the Saudi Fund for Development (SFD) and is expected to have a duration of 36 months. The contract was signed on the 10th of April 2023.The project scope encompasses comprehensive supervision of the implementation of drinking water supply systems, including water pumping stations, main transmission lines, sub-water networks, and home connections. MMEC and CCG will ensure the work complies with all relevant quality standards and occupational safety standards.
Key Project Components:
-Supervision and Monitoring: Oversee the implementation of water supply systems, ensuring adherence to technical specifications and quality standards.
-Testing and Reporting: Conduct necessary tests to ensure the quality of the executed works and prepare regular reports for the client.
-Plan Review and Modification: Study and review construction plans, making necessary modifications to align with site requirements and technical specifications.
-Quantity and Invoice Verification: Review the inventory of quantities and contractors’ invoices, submitting all necessary documentation to the client.
The project will be implemented in various villages across the Batken and Talas regions, with the head office located in Bishkek and sub-headquarters in Batken and Talas.


